Location
Provo, Utah
Client
Brigham Young University
Size
3,500 SF
Completed
2024
Role
Lighting Design Lead
Architect
BYU
General Contractor
Rod Lewis Construction
Electrical Contractor
Rydalch Electric
Photography
BYU
OVERVIEW
Completed in early 2024 ahead of BYU’s transition into the Big 12, this renovation transformed the Marriott Center basketball locker rooms into a modern, high-energy environment built for game-day prep, broadcast coverage, and recruiting.
Ceiling Integration
Staggered linear fixtures between suspended metal ceiling slats to provide crisp, glare-free illumination along player circulation paths, engineered with flicker-free dimming to ensure full compatibility with broadcast cameras.
Perimeter & Soffit Lighting
Designed a concealed mud-in extrusion along the perimeter soffit to wash both the ceiling and locker faces in uniform color, paired with low-profile toe-kick lighting to add depth across the floor.
Feature Ceiling Logo
Coordinated a custom internally illuminated central ceiling logo with both white and RGB backlighting, ensuring smooth, even diffusion across the acrylic face.