Location
Salt Lake City, Utah
Client
Biomerics
Completed
2018
Role
Lighting Design & Controls
Architect
Beecher Walker Architects
General Contractor
Layton Construction
Electrical Contractor
Taylor Electric
Photography
Neil Johnson, Layton Construction, Beecher Walker
Honors & Awards
ENR Mountain States, Best Projects, Manufacturing (2019)
OVERVIEW
Biomerics, a Salt Lake City medical device manufacturer, needed room to grow. Rather than build new, it remade a long-vacant 1988 industrial building near the airport into its headquarters. The full gut and remodel turned warehouse and production space into cleanrooms and labs, and added a new lobby, showroom, offices and staff amenities.
The lighting design follows that split between public and technical space. In the lobby, linear light runs within a sweeping wood-slat ceiling, so the ceiling’s curve carries the light instead of competing with it. At reception, RGB sources concealed inside the solid-surface desk glow through the material to form the Biomerics mark, so the logo is built into the desk rather than mounted on it. In the cleanrooms and labs, the lighting meets strict cleanliness and performance requirements. All-LED fixtures and a full lighting control system serve the entire building.
Photo © Neil Johnson
Photo © Neil Johnson
Photo © Neil Johnson
Photo © Neil Johnson
Photo © Neil Johnson